Friday, 18 December 2015

WEEK 14 (FYP2) - INDUSTRIAL DAY


Objective: 

1) To present the project that develop
2) To demo the project



Analysis/Discussion:

During week 14, basically the presentation day to the project  that develop at assessors to give mark and give the feedback about this project. The assessors that decided for this project are Madam Siti Zaiummi binti Mohd Zawawi and Madam Salmi binti Idin. Firstly, I present my project to assessors based on my poster. My project are totally showed from introduction until conclusion at the poster. So, I only explain more details about my project with full confident and  make the assessors understand about my project. After finished the explanation about my project, the assessors ask me some question regarding my poster. I answering the question smoothly until they satisfied with my answer. Lastly, I bring the assessors to outside the hall because I want to demo my project to them. The demo is to prove my project whether function or not and my project totally function. The feedback from assessors are positive after the demo.



During presentation to the assessors




After finished the presentation

Conclusion:

Finally, the Industrial Day/ Presentation Day was successfully done without has any problem. The system of my project working properly and the project successful to finished. So, for the next step is to submit my final year project full report with hardcover to my supervisor and university library.

Saturday, 12 December 2015

WEEK 13 (FYP2) - MAKING THE PREPARATION FOR THE INDUSTRIAL DAY AND DESIGN POSTER



Objective:

1) To repair the draft for final project report  

2) To design the poster for industrial day. 


Analysis/Discussion:

During week 13, basically repair  the final report draft for this project after referred from supervisor. Then, design the poster for presentation day about the project develop. After that, make the final preparation for presentation day by test the hardware prototype and select the specific information to put in the poster.

This week the draft report was repair and finish write then, the poster was design successfully by add the important information about this project and was printed A1 size ready to present next week during presentation day. All preparation was successful and do not has any problem to prepare because by follow the gantt chart that guide the successful of this project so the work was finish during the due date without has any problem.


Figure 1: Poster Development of Bike Security System



Conclusion:

   Finally, the draft final report that write followed the correct guideline and was repair by add some suggestion from supervisor madam noor hidayah. Then, poster design was finish  and ready for presentation day next week.

Saturday, 5 December 2015

WEEK 12 (FYP2) - TOUCH UP THE FINAL REPORT DRAFT 


Objective:

1) To touch up the final report draft.


Analysis/Discussion:

During week 12, basically write the draft report. The draft report was cover from chapter 4 and chapter 5 only because chapter 1, chapter 2 and chapter 3 was completed in final year project 1 last semester. By refer the proposal report was finish from Final Years project 1 and the result that record for this project all information was collect and put into the draft report. The draft report making more easy and do not has any problem by follow the guideline how to write the final report.



Conclusion:

After complete the draft report for chapter 4 and chapter 5, the draft report was sent to madam noor hidayah binti mohd yunus to checking either it correct or not.