Saturday 12 December 2015

WEEK 13 (FYP2) - MAKING THE PREPARATION FOR THE INDUSTRIAL DAY AND DESIGN POSTER



Objective:

1) To repair the draft for final project report  

2) To design the poster for industrial day. 


Analysis/Discussion:

During week 13, basically repair  the final report draft for this project after referred from supervisor. Then, design the poster for presentation day about the project develop. After that, make the final preparation for presentation day by test the hardware prototype and select the specific information to put in the poster.

This week the draft report was repair and finish write then, the poster was design successfully by add the important information about this project and was printed A1 size ready to present next week during presentation day. All preparation was successful and do not has any problem to prepare because by follow the gantt chart that guide the successful of this project so the work was finish during the due date without has any problem.


Figure 1: Poster Development of Bike Security System



Conclusion:

   Finally, the draft final report that write followed the correct guideline and was repair by add some suggestion from supervisor madam noor hidayah. Then, poster design was finish  and ready for presentation day next week.

No comments:

Post a Comment